This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
mdcpickandplace:sparkfun:testimonials [2010/01/11 21:37] sikdof |
mdcpickandplace:sparkfun:testimonials [2010/01/11 21:39] sikdof |
||
---|---|---|---|
Line 22: | Line 22: | ||
===== Robert Hunke, current Chief Pick and Place Operator ===== | ===== Robert Hunke, current Chief Pick and Place Operator ===== | ||
- | Overall Experience with PnP machines | + | Overall Experience with the Machines |
Both machine have worked great for us since we've had them. In my personal experience I have not come across any major problems or issues that have shut us down for a significant amount of time. There have been minor problems such as broken nozzles, broken Z-axis spring, etc. but these are all anticipated problems. If you run a machine at the rate we do you are bound to break something eventually. | Both machine have worked great for us since we've had them. In my personal experience I have not come across any major problems or issues that have shut us down for a significant amount of time. There have been minor problems such as broken nozzles, broken Z-axis spring, etc. but these are all anticipated problems. If you run a machine at the rate we do you are bound to break something eventually. | ||
+ | |||
+ | We run our MC383 for approximately 15-18 hours a day and the MC384 for 8 hours a day. They have dealt with this work load perfectly, as long as we keep up on our maintenance. We do general maintenance on the machines every 40 machine hours which equates to about once every 10-12 working days. The maintenance is simple in itself, basic lubrication of the X, Y, and Z rails, re-packing of the bearings for the worm gears, and general cleaning. We also run calibrations at the 40 hour interval which are also simple. | ||
+ | |||
+ | Overall Experience with Manncorp |