User Tools

Site Tools


mdcpickandplace:sparkfun:testimonials

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
mdcpickandplace:sparkfun:testimonials [2010/01/11 21:32]
sikdof
mdcpickandplace:sparkfun:testimonials [2016/01/28 18:05] (current)
Line 22: Line 22:
 ===== Robert Hunke, current Chief Pick and Place Operator ===== ===== Robert Hunke, current Chief Pick and Place Operator =====
  
-Overall Experience with PnP machines+Overall Experience with the Machines
  
-Both machines (MC383V & MC384F) ​have worked great for us since we've had them.  In my personal experience I have not come across any major problems or issues that have shut us down for a significant amount of time.  There have been minor problems such as broken nozzles, broken Z-axis spring, etc. but these are all anticipated problems. ​ If you run a machine at the rate we do you are bound to break something eventually. ​ +Both machine ​have worked great for us since we've had them. In my personal experience I have not come across any major problems or issues that have shut us down for a significant amount of time. There have been minor problems such as broken nozzles, broken Z-axis spring, etc. but these are all anticipated problems. ​ If you run a machine at the rate we do you are bound to break something eventually.
  
-   We run our MC383 for approximately 15-18 hours a day and the MC384 for 8 hours a day.  They have dealt with this work load perfectly, as long as we keep up on our maintenance. ​ We do general maintenance on the machines every 40 machine hours which equates to about once every 10-12 working days.  The maintenance is simple in itself, basic lubrication of the X, Y, and Z rails, re-packing of the bearings for the worm gears, and general cleaning. ​ We also run calibrations at the 40 hour interval which are also simple.+We run our MC383 for approximately 15-18 hours a day and the MC384 for 8 hours a day.  They have dealt with this work load perfectly, as long as we keep up on our maintenance. ​ We do general maintenance on the machines every 40 machine hours which equates to about once every 10-12 working days.  The maintenance is simple in itself, basic lubrication of the X, Y, and Z rails, re-packing of the bearings for the worm gears, and general cleaning. ​ We also run calibrations at the 40 hour interval which are also simple
 + 
 +Overall Experience with Manncorp 
 + 
 +Manncorp has been great in getting us replacement parts for anything that breaks. ​ They have also been very helpful when it comes to tricky software issues. ​ Things like calibrations,​ trained images, feeder issues, have all been easy to work through with their help.  Their customer service is great, we have had to order in a few extra parts for our newer machine and they respond very quickly. ​ They are also good about fixing faulty pieces of equipment. ​ Just recently we noticed that 5 of our 8mm feeders were not working correctly and we were able to return them to Manncorp for proper installation of a replacement part.  
 + 
 +All in all, our machines are great, run perfectly with proper maintenance and operation, and Manncorp provides all the necessary assistance and expertise to keep things running smoothly.